Real-world results from complex sewer rehabilitation challenges across India.

Real Work, Real Results

Success Stories in Action

Explore how DrainPro’s trenchless technology and expert execution have solved major infrastructure issues — from heritage zones to high-traffic corridors. Our case studies demonstrate precision, speed, and sustainability in action, tailored to diverse site demands.

5-3

Rehabilitation of 1400mm/1600mm Sewer Pipe

At IFFCO Chowk, Gurugram (NH8), DrainPro resolved severe structural degradation beneath a high-traffic flyover. CIPP lining restored full pipe strength without excavation, minimizing disruption near critical infrastructure.

4

CIPP: An Answer to Infiltration/Exfiltration

In Rampur, severe groundwater infiltration risked structural collapse and public safety. Using CCTV inspection and CIPP lining, our team sealed damaged joints and restored function — all before monsoon season.

Allahabad District D Sewer (UP)

Desilting rehabilitation of 600mm dia to 1000mm dia old brick sewer in sewerage Dist-D at Allahabad under JNNURM .The length of sewer rehabilitated under this project was

Read More »

Atala Sewer in Allahabad (UP)

The project is part of Package I in Allahabad District A involved Survey Investigation,  soil testing,  Design Supply Construction and Installation,  Commissioning & Testing of

Read More »